Insulation of roofs with the system monosi plus XPS

Advantages of the monosi plus XPS system

  • Very light weight
  • Triple waterproofing that offers great safety and durability.
  • Low implementation cost.
  • Ideal insulation system before tiling
  • Quick application. Delivery in 4-5 days
  • It can be implemented all year round without fear.
  • Multi-year written warranty
  • It is applied to all roofs that have correct slopes (inclines)
  • Can be applied to all types of roofing (tiles, mosaics, concrete, old insulation, etc.)
  • It has minimal requirements in pre-works (gutters, building of barriers, etc.)
  • Ideal system to become totally accessible in the future (with additional placement of therbobeto and tiles)

Flat roof insulation by Andreoy group

  1. Trust Andreoy Insulation SA as well as thousands of others. It applies:
  • Quality Control System ISO 9001: 2015 & Environmental Management System ISO 14001: 2015
  • Occupational Health and Safety Management System ISO 45001:2018
  1. All the construction crews of Andreoy Insulation SA consist of:
  • Certified technicians on Insulations / Insulators by ESYD in accordance with the International Standard ISO / IEC 170244
  • Specialized and certified technicians according to DIN CERTCO

Andreoy insulations guarantee

Ask our offer and prices for the system monosi plus - XPS

Contact us. We give solutions. Simply!

  1. Fill the contact form
  2. Call us at the following telephone numbers: 210 62 55 780, 22 210 79 950
  3. Come to our technical departments in Athens and Chalkida
  4. Visit our Facebook and Twitter pages and send a message

Andreoy Insulation SA is available in Athens, Attica, Chalkida, Evia, Thiva and Viotia.

 

Technical description of the system Monosi Plus - XPS

monosi plus XPS roof insulation system

Surface cleaning

Cleaning of the surface with special machines and local surface repairs (wherever required).

First waterproofing

The first system waterproofing is made by installing a flexible FLEXTHERMO white two-component waterproofing compound that creates a flexible waterproofing membrane and offers great adhesion. The application is done in two layers. It is recommended to reinforce the first layer with alkali-resistant glass mesh.

Installation of thermal insulation

Installation of the XPS extruded polystyrene thermal insulation plates & grouting the joints of the plates with the same material (if applicable). The thickness of the thermal insulating material needed is assessed by our certified insulators and is arranged upon consultation with the owner.

Second waterproofing

Adhesive of the first THERMODIEN Nero stick membrane which is perpendicular to the slopes with a width of 15cm & 15cm between the rolls, while the widthwise joints do not coincide.

Third waterproofing

Then follows the hot gluing of the third bitumen membrane THERMODIEN ENERGY PLUS SBS (ΕΝ 13707) with a non-woven polyester weight carrier 6Kg per m2, -20οC & weight of polyester cloth180gr/m2 .The bonding of the membranes is perpendicular to the slopes with a width of 10cm & 15cm between the rolls, the widthwise joints do not coincide.

Ventilation system

Installation of special type ventilators from which water vapor is discharged at about 30-60 m2 & at the highest points of insulation.

Special system pieces

Special membrane pieces are installed to further strengthen the system seal. The special pieces are placed on the perimeter parapets.

Mechanical fastening of the membrane

Mechanically fastening of the membrane with special blade pieces and sealing with polyurethane mastic.

Protection of compounds.

Cold coating on all the bituminous membrane compounds by applying ROOF ENERGY COOL elastomeric, highly elastic and waterproofing material based on new technology of acrylic & polyurethane resins.ες.

Gutter protection

Reinforcement in the gutter nozzles with special membrane placement and ROOF ENERGY COOL coating as well as polyurethane mastic. At the end of the work, protective grills are placed in all the gutters so that they do not block from tree leaves and other objects.

We use only certified insulating materials and our own certified & specialized insulation crews.